in the BOM on the Item Detail Screen: General Data (data block for quantity data).You have entered values for calculating component scrap in the material master or the BOM: You use this function to plan the scrap of a component that may break during production of an assembly. The dependent requirements of the material components are therefore increased correspondingly. Furthermore, the estimate yield of the assembly is always displayed in the MRP list or in the stock/requirements list.Īssembly scrap increases the order quantity of the assembly and subsequently increases the order quantity for corresponding components.

However, the system always uses the estimate yield for the availability calculation for the assembly.

The system automatically increases the quantity to be produced by the percentage of scrap. You have maintained the assembly scrap in the material master ( MRP 1 view) as a percentage in the Assembly scrap field for the assembly header material. You use this function to plan the scrap that results from the production of an assembly. Three calculation procedures are supported by the system: The scrap quantity is settled against the net requirements quantity. Which calculation the system uses depends on the settings in the material master record or in the BOM. These scrap quantities are then included in the planning run and in the calculation of production costs. You can calculate and plan the scrap quantity that will result from production.